Two weeks ago, I posted on LinkedIn about startups that promise to turn drawings or prompts into BIM models with minimal effort. I had tested several of these services and asked my network which AI-to-BIM tools had produced usable models in real-world projects. My goal was to compile a list of tools worth considering.
One comment shifted the discussion to a different direction. Amir Berman, VP of Industry Transformation at Buildots, wrote:
“People are building for the past. I would say there’re probably 200+ teams building a version of this right now. I would claim that 3-4 years from now the 3D model, as a rendered artifact isn’t that required any more. The data model that, among other things, holds the parameters and the real-world dependencies between physical elements is. It’s like building an RFI tool in 2026. Pointless.”
I invited Amir to the AEC Business podcast to share his insights. He also leads the Buildots Intelligence Lab, which analyzes anonymized construction data from projects worldwide.
Hundreds of teams, one local problem
The tools I tested fell into two groups. Some looked impressive at first glance but produced messy, unprofessional models that no one could use in a project. These may fool uninformed investors, but they do little for designers or contractors. A smaller group of companies put serious effort into delivering models that professionals can work with.
Amir estimated in his comment that more than 200 teams were working on the drawing-to-BIM problem. In our conversation, he said there were probably 300 more since then. He explained that AI has lowered the barrier to entry for building software. It has become easy to spot local inefficiencies, such as 3D being more useful than 2D for certain tasks, and to build a tool that addresses them.
The same trend is evident more broadly in software. Developers now use AI to recreate familiar applications in days, and I would not be surprised to see open-source BIM tools built with AI appear on GitHub soon. Amir noted that certain parts of coding have become a commodity. When building a tool is this easy, the harder question is whether it will still be needed in a few years.
Who will read the model?
Amir made clear that he values the work behind 2D-to-3D conversion. If a team is improving its workflow over the next 12 to 24 months, he sees no problem with that. His concern is with companies building for the long term without asking what will drive demand in three to four years. The need for accurate, coordinated design that teams can manufacture and build from is here to stay, in both 2D and 3D.
In his view, the key change is who does the design work. He expects that within three to four years, teams of AI agents will take an owner’s specifications and documents and produce the structural, architectural, and MEP designs. The agents would run repeated cycles of design review and optimization among themselves. He also expects RFIs to decrease because the agents could raise and resolve many of them before the design reaches the site.
This leads to his central question. Imagine an agent designing the MEP rough-ins for a healthcare facility, with access to the owner’s spec, past fabrication data, drawings from earlier buildings, and the other agents designing the rest of the structure. Does that agent need a rendered 3D model, or a 3D representation in data form? Amir used a simple cube as an example: every vertex has coordinates that can be stored in a table, and the agent can work directly with that table. The rendering exists so a human can perceive the shape.
Where 3D still earns its place
Amir does not claim that 3D modeling is dead. Buildots itself relies on 3D depth when its computer vision must determine which duct piece has been installed in a dense mix of pipework, cable trays, busbars, and ductwork. The difference is that the same depth information can be stored in data tables. Whether anyone needs to see it rendered depends on the user.
A recent Finnish research report I read adds an interesting angle. It found that most material quantity calculations are still based on 2D drawings, which people interpret manually. Those drawings are often generated from BIM models in the first place. The industry has invested heavily in 3D, yet much of the practical work still flows through a human reading a sheet.
This suggests that the rendered model already serves primarily as a communication tool. Clients and users need to visualize the result, and design teams need to review it together. These needs will persist as long as people make decisions about buildings. The question Amir raises is how much of the remaining work will be done by people.
The data model underneath
Buildots already works this way. Amir described how the company extracts information from Revit and Navisworks files, drawings, and schedules and loads it into its own data model. That model holds the project’s tasks, trades, activities, quantities, and durations. Site captures from 360 cameras, drones, and laser scanners are then analyzed so that each element, such as a single duct or wall, becomes a data point for comparison with the plan.
Amir highlighted the difference between information and data. A project starts with abundant information in drawings, contracts, and schedules, but that information becomes useful for analysis and automation only when it is structured. This is the kind of model he referred to in his LinkedIn comment: one that holds parameters and the real-world dependencies among physical elements. Agents need that structure far more than they need a visual.
He also called for a standardization layer across projects. A mechanical contractor repeats most of the same activities from one job to the next, yet measurements of that work are rarely comparable. A common taxonomy for activities and benchmarks would enable owners, contractors, and suppliers to interpret each other’s numbers consistently. Amir sees this as the foundation for agentic design, scheduling, contracting, and research, and as a way for new companies to contribute from day one.
What this means for builders and buyers
For software developers, Amir’s advice is to look at where demand is headed before deciding what to build. A drawing-to-BIM tool can deliver real value today, as the better tools in my tests demonstrated. A company planning for the next five years should ask whether its users will be people or agents and what format each needs. Structured data about elements, quantities, and dependencies is likely to outlast any particular display format.
For AEC firms, the practical step is to treat project data as an asset that grows over time. Owners who build several data centers, hospitals, or housing projects each year can carry their data from one project to the next, making better decisions each time. Contractors and trades benefit when they measure their work consistently enough to compare across jobs. None of this requires waiting for design agents to arrive.
My view is that 3D models will remain with us for a long time as a way for people to understand and agree on a design. I also agree with Amir that the model behind the rendering holds most of the future value. Firms that structure their data now will be better positioned to use AI agents when those agents become part of everyday design work.
You can hear the full conversation with Amir Berman in the latest episode of the AEC Business podcast.